Concrete Works
Location
Pilbara, Western Australia
Project Overview
Core delivered reinforced-concrete foundation and slab works for dome structures within a remote Pilbara environment. The scope included survey set-out, excavation, subgrade preparation, formwork, reinforcement installation, embedded-item coordination, concrete placement, vibration, finishing and curing in accordance with the client-issued drawings and technical specifications.
Scope of Works
- Survey set-out and level control
- Foundation excavation and subgrade preparation
- Formwork and reinforcement installation
- Hold-down bolts and embedded-item coordination
- Concrete placement, vibration and finishing
- Curing, dimensional verification and QA/QC inspections
- Formwork removal and surrounding-area reinstatement
Project Duration
Six-week delivery programme
Safety Approach
Concrete activities were managed under approved SWMS and ISO 45001-aligned HSE controls. Critical controls addressed excavation safety, formwork stability, reinforcement protection, concrete-pump exclusion zones, line-of-fire hazards, mobile-plant interfaces and safe handling of wet concrete.